Project

Electrified Double Track Project (EDTP) - Ipoh to Padang Besar

Ipoh to Padang Besar Line

Overview

We are the civil and structural consulting engineers for the following facilities:

3 Project Site Offices (PSO)

  • Alor Setar
  • Taiping
  • Bukit Mertajam

7 Sites of Staff Quarters (SQ)

  • Padang Besar
  • Alor Setar
  • Bukit Mertajam
  • Ipoh
  • Kuala Kangsar
  • Sungai Petani
  • Taiping

10 Stations (Major and Minor) with Elevated Platform

  • Padang Besar
  • Bukit Ketri
  • Arau
  • Kodiang
  • Anak Bukit (halt)
  • Alor Setar
  • Gurun
  • Sungai Petani
  • Tasek Gelugor
  • Kobah

Design Consideration/Service Provided

Geotechnical/Foundation Design

Geotechnical

  • Soil Improvement of Soft Soil
  • Slope Protection (Stability)
  • Driven RC Piles
  • Raft Foundation
  • Retaining Wall
  • Micropiles

Basement

  • Without Basement


Structural Analysis & Design
  • Reinforced Concrete Structure
  • Elevated Reinforced Concrete Platform
  • Steel Structure Roof for Station and Platform
Civil/Infrastructure Engineering
  • Earthworks
  • Large Open Car Park Space
  • Road and Drainage System
  • Water Reticulation
  • Sewerage Reticulation
Architectural Design